Close Menu
    Facebook X (Twitter) Instagram
    • Home
    • Privacy Policy
    • Terms of Service
    • About Us
    • Contact Us
    Facebook X (Twitter) Instagram Pinterest Vimeo
    GOSSIP A - Z
    • Home
    • POLITICS
    • News
    • CELEB TRENDS
    • Health
    • Relationship
    • SPORTS
    GOSSIP A - Z
    Home ยป Murkomen Holds Uhuru Gov’t Accountable for JKIA Roof Leak
    News

    Murkomen Holds Uhuru Gov’t Accountable for JKIA Roof Leak

    ianBy ianNovember 14, 2023No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp Copy Link
    Follow Us
    Google News Flipboard Threads
    CS Murkomen
    CS Murkomen
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Murkomen Holds Uhuru Gov’t Accountable for JKIA Roof Leak

    Transport Cabinet Secretary Kipchumba Murkomen says the leaking roof at the Jomo Kenyatta International Airport (JKIA) is a result of poor workmanship by the contractor and engineers who were doing renovations at Terminal 1C and 1 E in the previous government of President Uhuru Kenyatta.

    He said the contractors hurriedly carried out the temporary renovations without meeting the required standards since the government was in the process of decommissioning the terminal and constructing a new one.

    Speaking in Diani, Kwale County while inspecting the expansion of Diani Airport, Murkomen said the renovations will be redone according to the required standards.

    He maintained the engineers and contractor who were overseeing the renovations would have to explain why they did a shoddy job that led to the leaking yesterday.

    โ€œThey will have to explain the scope of work that was used in the renovations that when there is heavy rainfall, there must be a leakage,” he said.

    ALSO READ:

    • Super Petrol Price To Remain Unchanged As Govโ€™t Lowers Diesel, Kerosene Costs By Ksh.2
    • Five Suspects Held 10 Days in Sh94.9m Quickmart Heist Case

    He however said the leaking roof has been temporarily fixed to avert further leakage in this rainy season.

    The CS said a new contract will be awarded to construct a new terminal in the greenfield area at the Airport.

    The contract will be a private-public partnership that will commence in January 2024.

    “We already have the feasibility study and the President has said we have to deliver a complete new Airport by 2027,” he said.

    On the power supply at the airport, Murkomen said that the government has already fixed the outage challenge by installing a stand-by generator but still, there is a hiccup on interchange time.

    He said the power interchange is now taking 20 minutes but they are working to ensure they reduce the time to 30 seconds.

    Murkomen Holds Uhuru Gov’t Accountable for JKIA Roof Leak

    JKIA MURKOMEN
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp Copy Link
    ian
    • Website

    Related Posts

    CELEB TRENDS

    Under and Over 7 โ€” when the rules are simple, but the emotions are intenseย 

    July 29, 2025
    CELEB TRENDS

    CAF Trophy Hunt: Win iPhone, MacBook, PlayStation, and other prizes in 1xBet promo!ย 

    July 26, 2025
    News

    Matiang’i: No Scores to Settle, I Just Want to Fix My Country

    July 14, 2025
    News

    IEBC Breaks Silence on Alleged Plot to Rig 2027 Elections

    July 14, 2025
    News

    Kenyaโ€™s President Ruto Mourns Former Nigerian President Muhammadu Buhari

    July 14, 2025
    News

    Three Arrested in Connection with Magunas Supermarket Arson and Looting During Saba Saba Protests

    July 13, 2025
    Add A Comment

    Comments are closed.

    © 2025 ThemeSphere. Designed by ThemeSphere.
    • Home
    • Privacy Policy
    • Terms of Service
    • About Us
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.